NLI ELEKTROSYSTEMER AWARDED E&I CONTRACT AT E134 VÅGSLI, HAUKELIFJELL

08/09/21

NLI ELEKTROSYSTEMER AWARDED E&I CONTRACT AT E134 VÅGSLI, HAUKELIFJELL

Statens vegvesen is constructing a new line-up area at E134 Vågsli.
 

 

 

When bad weather conditions occurs at Haukelifjell during wintertime, the new line-up area will be used by waiting vehicles, in particular heavy load transport. The site is located one kilometre west of Tyrveli in Vinje municipality, as shown in illustration below.

Morgedal Entreprenør is the main civil contractor, and has subcontracted the electrical work to NLI Elektrosystemer.

NLI will deliver traffic control systems with variable signs, information boards as well as systems for barriers. In addition, the contract includes traffic lights and traditional electrical work.

The new line-up area at Haukeli are scheduled to be completed in September 2022.

Contact: Olav Bolseth, Managing Director NLI Elektrosystemer AS
olav.bolseth@nli.no

 

Se hjemmeside her